Nugroho W P, S., Rumita, R., & Putra, A. W. (2014). PERENCANAAN KEBIJAKAN OVERHAUL DAN ANALISIS PENGADAAN MESIN STANDBY PADA MESIN HOIST CURING UTARA DAN SELATAN PLANT I-8 (STUDI KASUS PT. WIJAYA KARYA BETON BOGOR). Prosiding Sains Nasional Dan Teknologi, 1(1). https://doi.org/10.36499/psnst.v1i1.1015